Case Studies

Solomon Mine Trinity Drive Overpass

FMG needed a heavy vehicle overpass to allow for the segregation of light and heavy vehicles on the existing Trinity Drive Access Road at their Solomon Mine.

We were engaged by long-time partners, NRW Civil and Mining, to install the multiplate corrugated steel tunnel. It was a true team effort to ensure the quality of the finished project, with NRW preparing the concrete footings. This was pivotal as it allowed us to ensure the first multiplate tunnel arches were installed in alignment.

It ensured the installation of the remaining panels was accurate and went smoothly. Nothing in these parts is small – the end result was an 81m tunnel, 7.2m high and 11.4m wide.

We’re proud to say that our experienced 12-man crew completed these high-risk works on time and without incident.

$600K

Client

NRW Civil and Mining

Location

Pilbara, WA

Project Duration

1 Month

Project Start

December 2015

Project Finish

January 2016

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our construction contractors can make your next project a success.

Contact Us