Port Hedland Inner Harbour Project Culverts and Concrete Works

When BHP was using NRW to build their Port Hedland Inner Harbour Project, NRW called on our expertise to install culverts and underground services. The project was a combination of culverts and concrete works, as well as significant formwork on tight deadlines.

For the Mooka Drainage culvert works, we installed DN450 and DN600 culverts, which included excavations and prep work, and the install of cement slabs and rock armour, to ensure these works were more than up to the task.

The Finucane Island Underground Services required 3 km of trenching, with backfill and compaction of PVC conduit, and the connection to liners and pits with trafficable lids.

The Finucane South Creek Culverts component required a different approach. The existing CSP’s were excavated and removed, then prep works for the new RCB culverts were installed, which included concrete base slab and end treatments such as aprons, headwalls, wingwalls and cut off walls.

$5.6M

Client

NRW Civil and Mining

Location

Port Hedland, WA

Project Duration

6 Months

Project Start

May 2012

Project Finish

October 2012

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Supply and Install FRÄNKISCHE Infiltration Storage System

The City of Cockburn required a section of their stormwater drainage to be upgraded to ensure the ongoing o

PathLearn more
Hayman 15 Sumping

TCD were engaged by FMG to prepare the HAY15 area for upcoming mining operations.  This involved the const

PathLearn more
Far West Hub Project

TCD were engaged by FMG for the Far Web Hub Project – Detailed Earthworks and the Supply and Construction

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our construction contractors can make your next project a success.

Contact Us