Case Studies

Baldivis North Type 10 WWPS and Pressure Main

When TCD Civil Construction was the contract for the preliminary site works and installation of a Type 10 Pump Station in Baldivis, it called for the a truly multi-disciplinary approach. There was a long list of requirements:

  • Clearing of the pressure main pipe routes
  • Excavation and associated earthworks
  • Installation of the type 10 wastewater pumping station
  • Thirteen overflow storage tanks
  • Associated access chamber inlet gravity sewer pipeline and site works
  • Supply, delivery and installation of all pipes, valves, fittings and pits
  • Backfilling and compaction of excavated trenches
  • Pipelines pressure testing and disinfection
  • Restoration work at inter-connections with existing water mains
  • Restoration of the site and disposal of surplus excavated material

Thanks to the seamless integration and management of our services, our team successfully completed this complex project to a high standard, on time and on budget.

$1.4M

Client

Perron Developments

Location

Baldivis, WA

Project Duration

4 Months

Project Start

July 2017

Project Finish

November 2017

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Flying Fish Dewatering

FMG’s Eliwana Mine Site required the installation of dewatering infrastructure to allow the mining of the

PathLearn more
Solomon Stockyards 1A TN Pump Install & Tie-Ins

FMG undertook a review of Solomon’s forecasted water balance and identified the requirement to reequip an

PathLearn more
Roy Hill ROM4 Drainage

TCD were engaged by Nepean for delivery of the Roy Hill ROM 4 Marble Bar Road Upgrade Project.  The scope

PathLearn more
Path

Talk to our Civil Construction Experts

We’re a trusted partner for the civil mining and construction industry. Our construction contractors can make your next project a success.

Contact Us