Vertical WHIMS Facility Upgrade – Bulk Earthworks

TCD were engaged by FMG to complete the Bulk Earthworks on Vertical WHIMS (Wet High Intensity Magnetic Separation) Facility at their Christmas Creek Mine Site.

The scope of works included:

  • Construction of the WHIMS Building Pad, Concentrate Thickener Pad, belt Filter Pad, Screen Building Pad, two Switchroom Pads and crane pads.
  • Construction and modification of various access roads around the perimeter of the Vertical WHIMS Facility.
  • Construction and modification of various drainage systems, including the supply and installation of culverts and open drains.
  • Protection and relocation of existing services.
  • Blending of fill materials from three different source locations to meet the stringent fill material specification.
$2.8M

Client

FMG

Location

Pilbara, WA

Project Duration

3 months

Project Start

February 2020

Project Finish

April 2020

Our Recent Projects

We’re proud of our achievements. Read about our recent projects and case studies to see what we’ve been working on and how we could work with you.

View all projects
Path
Supply and Install FRÄNKISCHE Infiltration Storage System

The City of Cockburn required a section of their stormwater drainage to be upgraded to ensure the ongoing o

PathLearn more
Hayman 15 Sumping

TCD were engaged by FMG to prepare the HAY15 area for upcoming mining operations.  This involved the const

PathLearn more
Far West Hub Project

TCD were engaged by FMG for the Far Web Hub Project – Detailed Earthworks and the Supply and Construction